Pages

Friday, 8 January 2016

Friday 5th day

Today Warren and his team, did more work inside.
The knocked out the old bathroom wall, making the front room the same size as it originally used to be. Surprisingly spacious.

The shower curtain is still up to screen the toilet from the street. Handy for now. A little more privacy for those in need of the loo.

Down stairs, they have knocked through making a hole of 140cm wide and about 2 meters high.
It is being propped up with loads of posts until the steels come next week.
Warren hopes to remove the door frame and fill in the gap where the door into the front room is so next week that room will only be able to be accessed via the middle room

They have done so well. The garden too is nearly cleared from garden rubble and plant roots.

I contacted Tuin to get some clarity about the log cabin, received the following email back
Dear Mrs Wells,

Thank you for your enquiry. Please see this page which explains the foundation beam options available: http://www.tuin.co.uk/blog/foundation-beams/ as standard it comes with square, tanalised timber foundation beams.

Please see this article for details on floors which will also explain why you would choose a floor as an option: http://www.tuin.co.uk/blog/log-cabin-floor/

This page gives details of our fitting service: http://www.tuin.co.uk/Tuin-Fitting-Service.html A wolfgang is normally a two day fit. I have also included self employed installers below, for your area i would recommend speaking to Philip or Warren.

Highly Recommended Installers
Philip Robinson - 07538089609 -  Email - philiposorio20@yahoo.com
£ 960 with roof and floor insulation.

We are booked in on March 4/5th. Please confirm by email ASAP please and will send over a list soon . 


Kind Regards
Philip Osorio 
Mobile - 07538089609


Please also find attached a plan of the Wolfgang minimum base size when using standard foundation beams.

Please let me know if i can help any further.

Best regards
Richard

Tuin | Team | UK
Tel: 01508 558308
Mon - Fri 0900 - 1700
Brooke Industrial Park
Norwich Rd
Brooke
Norfolk
NR15 1HJ


On 8 January 2016 at 17:15,  <wells.karina@gmail.com> wrote:


- I am interested in the Wolfgang log cabin. Our builders will be putting in the foundation as they are doing an extension of the house any way. In your drop box, what does standard foundations included mean? Would I need an extra floor or will it be built straight on the concrete? Also, have you got installers to built it for us, if so, how much will this be? We live in Cambridge. I look forward to hearing from you soon, so that we can give you the order. Many thanks Karina. PS have you got a picture of the log cabin with the various shingles?

A question about Wolfgang Log Cabin 5.3x3.0m-4.5m:
Customer info:

Username:karina wells
Email:wells.karina@gmail.com
Phone:07914330844

Thank you. The Tuin TeamTuin :: Tuindeco
Phone: 01508 558308
URL: www.tuin.co.uk
Wolfgang-footprint.jpg

I have forwarded this information to Sean and Warren so they have the floor plan and answers to my questions

No comments:

Post a Comment